A line between stations P and Q laid on a slope of 1 in 5 was measured as 350 m using a 50 m tape. The tape is known to be short by 0.1 m.
The corrected horizontal length (in m) of the line PQ will be
- A342.52
- B349.30
- C356.20
- D350.70
SurveyingPlane and geodetic surveying, GNSS surveying, errors and their adjustmentMCQ1 mark · −1/3 if wrongEasy
A GATE question every morning
One real past-paper question every morning for your branch, answer hidden until you tap. Free on Telegram.