GATE CE 2022 (S1) — Question 62

Traffic EngineeringSignal design by Webster’s methodNAT2 marksEasy

A two-phase signalized intersection is designed with a cycle time of 100 s. The amber and red times for each phase are 4 s and 50 s, respectively. If the total lost time per phase due to start-up and clearance is 2 s, the effective green time of each phase is ______s. (in integer)