Construction MaterialsConcrete – Constituents, mix design, short-term and long-term propertiesMCQ1 mark · −1/3 if wrongEasy

The following figure shows the arrangement of formwork for casting a cantilever RC beam.
Question image
The correct sequence of removing the Shores/Props is
  1. A
    S1→S2→S3→S4→S5
  2. B
    S5→S4→S3→S2→S1
  3. C
    S3→S2→S4→S1→S5
  4. D
    S3→S4→S2→S5→S1