The total primary consolidation settlement () of a building constructed on a 10 m thick saturated clay layer is estimated to be 50 mm. After 300 days of the construction of the building, primary consolidation settlement was reported as 10 mm. The additional time (in days) required to achieve 50% of will be ______________________ (rounded off to the nearest integer).
GATE CE 2024 (S1) — Question 53
Soil MechanicsCompaction of soilsNAT2 marksMedium
A GATE question every morning
One real past-paper question every morning for your branch, answer hidden until you tap. Free on Telegram.
More on Compaction of soils
- GATE CE 2026 (S2) · Q58A building is proposed in an area having thick deposit of silty clay. The water table is at the ground surface. The saturated unit weight o…
- GATE CE 2025 (S2) · Q32A 6 m thick clay stratum has drainage at both its top and bottom surface due to the presence of sand strata. The time to complete 50% conso…
- GATE CE 2023 (S1) · Q41Consider that a force P is acting on the surface of a half-space (Boussinesq’s problem). The expression for the vertical stress ( z) at any…
- GATE CE 2022 (S2) · Q32A concentrically loaded isolated square footing of size 2 m × 2 m carries a concentrated vertical load of 1000 kN. Considering Boussinesq’s…
- GATE CE 2022 (S2) · Q55A saturated compressible clay layer of thickness h is sandwiched between two sand layers, as shown in the figure. Initially, the total vert…
- GATE CE 2022 (S1) · Q32A concentrated vertical load of 3000 kN is applied on a horizontal ground surface. Points P and Q are at depths 1 m and 2 m below the groun…

