A vertical summit curve on a freight corridor is formed at the intersection of two gradients, +3.0% and −5.0%.
Assume the following:
Only large-sized trucks are allowed on this corridor
Design speed = 80 kmph
Eye height of truck drivers above the road surface = 2.30 m
Height of object above the road surface for which trucks need to stop = 0.35 m
Total reaction time of the truck drivers = 2.0 s
Coefficient of longitudinal friction of the road = 0.36
Stopping sight distance gets compensated on the gradient
The design length of the summit curve (in meters) to accommodate the stopping sight distance is __________ (rounded off to 2 decimal places).
GATE CE 2024 (S2) — Question 63
Traffic EngineeringTraffic studies on flow and speed, peak hour factor, accident study, statistical analysis of traffic dataNAT2 marksHard
A GATE question every morning
One real past-paper question every morning for your branch, answer hidden until you tap. Free on Telegram.
More on Traffic studies on flow and speed, peak hour factor, accident study, statistical analysis of traffic data
- GATE CE 2026 (S2) · Q23An incident occurred on one side of a median on a four-lane dual carriageway road section. This incident disrupted the traffic movement in…
- GATE CE 2026 (S2) · Q34A downgrade of 1 in 100 meets an upgrade of 1 in 125 on a road. If the rate of change of grade is 0.10 % per 30 m, the length (in m) of the…
- GATE CE 2026 (S2) · Q61A vertical curve is formed by a descending gradient of 1 in 40 meeting an ascending gradient of 1 in 50. Consider the following: Stopping S…
- GATE CE 2026 (S1) · Q33The travel times of three vehicles on a 2 km stretch of road are 4, 5, and 8 minutes. Assuming the speed of each vehicle to be constant in…
- GATE CE 2026 (S1) · Q60Traffic is moving on a 6-lane dual carriageway road. Traffic volume per direction during peak hour (08:00 am to 09:00 am) is 6000 veh/h. It…
- GATE CE 2025 (S2) · Q20The point where the road alignment changes from a tangent to a curve is known as .

